Electrical Permits & Inspections

State of Tennessee Electrical Wiring Permits:

Wiring Permits can be obtained at the Erwin Utilities Office.
Inspection Fee Schedule:
 Temporary Service 61-200 amp

 $27.00

 Footer Ground Permit

 $27.00

 Rough-In  $27.00
 Final:
61-200 amp
$27.00
 201-400 amp  $40.00
 401-600 amp  $50.00
 601-1000 amp  $90.00
 1001 amp & higher Permit cost is negotiated with
State Deputy Electrical Inspector
 Service Release  Fee is based on service size
 Service Change  $27.00 & up based on service size
 Reinspection, if necessary  $27.00 & up based on service size
 Permit Fee  $5.00

 

Electrical Inspections:

Electrical service cannot be provided until an approved electrical inspection is made. Inspections are made by the State of Tennessee Deputy Inspector on Tuesday and Thursday of each week.  It is the responsibility of the Customer to call the Deputy Inspector to arrange for an inspection. 

Inspector: Gene Rutherford
Phone: (423) 282-6742

Building Inspections:

Electric service cannot be provided until a Certificate of Occupancy is released from the Town of Erwin Building Inspector for all new structures requiring Electric, Water, and Wastewater services inside the city.  It is the responsibility of the Customer to call the Building Inspector to arrange for an inspection.

Inspector: Brian Hensley
Phone: (423)743-6231